Power quality

Power factor correction: what facility teams should review first

A practical introduction to power factor, capacitor-bank selection, harmonics and the information needed before proposing corrective equipment.

Published 2024-03-02Updated 2026-08-162 min read
Illustrated industrial energy-flow, demand and waveform analysis
Technical note: This article is general educational information. Confirm equipment instructions, current standards and site-specific requirements before taking action.

Start with the load profile, not the capacitor rating

Power factor correction is often discussed as an equipment purchase. A better starting point is to understand when reactive demand occurs, how quickly the load changes and what harmonic-producing equipment is connected.

Information worth collecting

  • Recent utility bills and interval-demand information where available.
  • Transformer, major motor, drive and existing capacitor-bank details.
  • Power factor and demand measurements across representative operating periods.
  • Harmonic measurements when variable-speed drives, rectifiers or other non-linear loads are significant.

Why harmonics matter

Capacitors interact with the impedance of the electrical system. Adding capacitance without considering harmonic conditions can increase stress or create resonance. Detuned or filtered arrangements may be appropriate in some systems, but selection should follow measurement and calculation.

A practical review sequence

  1. Confirm the commercial objective and utility billing mechanism.
  2. Measure demand, power factor and harmonic conditions.
  3. Review the existing correction equipment and switching behaviour.
  4. Model suitable corrective options and protection requirements.
  5. Verify performance after commissioning.
Project conversation

Need a site-specific engineering review?

Use the article as a starting point, then share the actual equipment, drawings, measurements and operating context for a project-specific discussion.

Discuss your requirement